150 Lot Residential Subdivision, Rouse Hill
DESIGN SCOPE:
- 3 x 500kVA padmount substations and associated 11kV lead in cables,
- Street lighting for all internal P category roads as well as the V category intersections that interfaced to the existing arterial road,
- LV reticulation to all proposed lots.
HIGHLIGHTS:
- Optimising the arrangement of LV distributors to reduce the overall constructions costs,
- Identifying substation locations that minimised the impact on properties.