11kV Cable Cross-Feeder Tie, Flinders
DESIGN SCOPE:
- 540m long 11kV cable interconnecting two existing padmount substations to create additional supply for the Shell Cove Boat Harbour Precinct.
HIGHLIGHTS:
- Upgrade of existing 11kV switchgear from legacy 3-phase Holec to newer ABB SafeLink,
- Developed custom HV padmount cubicle constructions to accommodate the new switchgear,
- Underboring of existing residential driveways to minimise disturbance to residents.