11kV and LV ABC Rural Power Line, Sussex Inlet

11kV and LV ABC Rural Power Line, Sussex Inlet

DESIGN SCOPE:

  • New 11kV power line (approx. 500m long), new LV ABC power line (approx. 1.3km long) and 25kVA pole substation to supply new NBN radio tower.

HIGHLIGHTS:

  • Arranging assessment and approval of vegetation clearing,
  • Maximised the distance of the LV component of the power line to reduce the developer's costs. 
  • Minimised vegetation clearing through use of 'covered' conductor,
  • Incorporated concrete poles due to the bush fire controls in the area.
11kV Rural Power Line and Pole Substation, Mulbring

11kV Rural Power Line and Pole Substation, Mulbring

220 Lot Residential Subdivision, Shell Cove